EH32 · East Lothian · for landlords
Complete bathroom projects in Aberlady
Aberlady is a small, conservation-led coastal village sitting between Longniddry and Gullane, with the bay and nature reserve on one side and a fringe of larger detached homes climbing toward Luffness and Spittal on the other. The village core is tightly conservation-controlled, the housing stock leans older and stonework-heavy, and there's a notable second-home and holiday-let contingent — so flue siting, conservation-area sensitivity and pre-season servicing all weigh more here than in the modern estates further inland.
Holiday-let owners want a single September or October pre-season service slot with digital records issued the same day. For bathroom installations, that changes the survey, specification or working sequence before price is agreed.
We design, supply and install full bathrooms across Aberlady — wet rooms, en-suites, walk-in showers, freestanding baths and full family bathroom refits. One project-managed team handles strip-out, plumbing, electrics, plastering and tiling, so you only ever deal with us. No three different trades calling at different times, no gaps in the schedule, no finger-pointing if something doesn't line up. This page is specifically for landlords who need to plan a complete, project-managed bathroom rather than coordinate separate trades.
Relevant work pattern
Local evidence behind the recommendation
- Pre-season holiday-let service round for a managing agent covering several EH32 properties in one block-booked window.
- Gravity-to-fully-pumped sealed system upgrade in an Aberlady Main Street stone cottage with new TRVs and a magnetic filter.
- Conservation-aware boiler relocation in a Haddington Road property to free up the kitchen layout, with re-routed flue and Building Notice paperwork lodged.

Likely projects, not a generic service list
This page is written for landlords who need to plan a complete, project-managed bathroom rather than coordinate separate trades.
- 01Gravity-to-fully-pumped sealed system upgrade in an Aberlady Main Street stone cottage with new TRVs and a magnetic filter.
- 02Conservation-aware boiler relocation in a Haddington Road property to free up the kitchen layout, with re-routed flue and Building Notice paperwork lodged.
- 03Pre-season holiday-let service round for a managing agent covering several EH32 properties in one block-booked window.
Nearby calls we can combine with this route
- Bathroom Installations in AthelstanefordEH39 · 1 hour 20 via the A1
- Bathroom Installations in North BerwickEH39 · 1 hour 15 via the A1 and A198
- Bathroom Installations in MusselburghEH21 · 1 hour 25 via the A1
- Bathroom Installations in KelsoTD5 · 0 minutes — we're based here
- Bathroom Installations in JedburghTD8 · 20 minutes via the A698
Relevant safeguards, not generic badges
- Trade accounts with leading bathroom suppliers — Bristan, Roca, Bette, Crosswater
- Fully insured installations with workmanship guarantee
- Project-managed by one main contact from quote to handover
From first survey to signed-off work
STEP 1
Quote & supply
Itemised written quote with full supply list — every tap, tile and trim costed. We also check: Holiday-let owners want a single September or October pre-season service slot with digital records issued the same day.
STEP 2
Installation
Project-managed strip-out, first-fix, tanking, tiling and second-fix.
STEP 3
Final walkthrough
Snagging, cleaning down, demo of any new tech and aftercare guidance.
STEP 4
Design visit
We measure up, talk through layout, finishes and any structural considerations.
Property and access context
What changes the job in Aberlady
- Holiday-let owners want a single September or October pre-season service slot with digital records issued the same day.
- Aberlady Conservation Area covers the bulk of the village core — external flue terminations and any visible pipework on Main Street elevations need careful planning and sometimes a Listed Building check.
- Many of the older Main Street and Haddington Road properties have legacy gravity-fed systems we routinely upgrade to fully pumped, sealed and properly balanced.
- Coastal exposure across the bay justifies stainless or coated flue terminations on properties facing the reserve.

Questions shaped by Aberlady properties
Are you set up for letting-agent holiday-let rounds in Aberlady?+
Yes — block-booking pre-season services and landlord CP12s for letting agents is a regular part of our EH32 work. We chase tenant access, issue digital certificates the same day, and set 30-day renewal reminders so nothing lapses.
Can you do a boiler swap in the Aberlady conservation area?+
Yes — we plan flue routes around conservation-sensitive elevations, prefer rear or side terminations where consents allow, and check with East Lothian planning on anything borderline before quoting. Most EH32 conservation work goes through under permitted development with the right siting.
What should be checked before quoting bathroom installations at this Aberlady property?+
Many of the older Main Street and Haddington Road properties have legacy gravity-fed systems we routinely upgrade to fully pumped, sealed and properly balanced. We confirm that point on site, then match the bathroom installations specification to the actual building and access rather than assuming every EH32 address is alike.
Is this page aimed at landlords?+
Yes. The recommendations prioritise landlords who need to plan a complete, project-managed bathroom rather than coordinate separate trades. If the building or occupancy differs, the survey is where we adjust the plan.
How long does a full bathroom take?+
A typical full refit takes 7–10 working days from strip-out to finish. Wet rooms and en-suites may take a little longer depending on tile choice, drainage runs and any structural changes.
Do you supply the bathroom or do I buy it?+
Either works — we can supply through trade accounts at a discount, or fit a bathroom you've sourced yourself. We're transparent on both routes inside the written quote.
Useful next pages for this project
- Boiler Installation for AberladyOld boiler, flue and any redundant pipework removed and disposed of responsibly.
- Servicing & Repairs for AberladyHonest fix-vs-replace advice — most repairs are well under the cost of replacement.
- Air Source Heat Pumps for AberladyQuiet, modern outdoor units sited carefully for noise, airflow and planning compliance.
- Aberlady neighbourhood guidesSee property-level notes within Aberlady.
Start with the property, not a stock bathroom installations quote
Tell us the building type, the issue and your EH32 address. We will confirm whether a survey, diagnostic visit or urgent response is the useful next step.
Aberlady is not being treated as an interchangeable location page. The recommendation starts with holiday-let owners want a single september or october pre-season service slot with digital records issued the same day. It then combines bathroom installations, the needs of landlords, access via the A1 and A198, and nearby coverage toward Longniddry and Spittal.
Tell us what is different about your property
Postcode, building type, occupancy and photographs help us preserve the same property-specific approach when we quote.
Get Your Free Quote
Tell us about your project — we'll respond within one working day.
